REVELATION
INDUSTRIAL TRAINING INSTITUTE |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
COURSE
DETAILS |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
INDUSTRIAL
AUTOMATION AND CONTROL
ENGINEERING
|
|
|
DURATION : FOUR MONTHS |
|
|
|
|
|
|
|
|
ELIGIBILITY : BE/
B-TECH |
|
|
|
|
|
|
|
|
MAJOR
SESSIONS IN WHICH TRAINING IMPARTED ARE |
|
|
|
|
|
Electrical drives and controls. |
|
|
|
|
|
|
|
|
Field
Instrumentation and Pneumatics |
|
|
|
|
|
|
|
Programmable Logic Controllers (PLC). - Allen-Bradley,
Siemens, Omron,Selec etc |
|
|
|
|
Supervisory Control And Data Acquisition (SCADA)-Real Win
,Intouch |
|
|
|
|
|
Distributed Control System (DCS)Human Machine Interface
(HMI) |
|
|
|
|
|
Human
Machine Interface (HMI) |
|
|
|
|
|
|
|
|
Control
panel designing. |
|
|
|
|
|
|
|
|
Project
Designs |
|
|
|
|
|
|
|
|
|
IMPLANT TRAINING IN PETROCHEMICHAL
PLANT |
|
|
|
|
|
1.
Electrical drives and controls |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Basics of
Relays, Contactor, MCB, MCCB, ELCB, ACB,SDF etc |
|
|
|
|
|
|
Working
details of different types of Electric Motors. |
|
|
|
|
|
|
|
Designing
of control circuits using Contactors, Relays, Timers etc |
|
|
|
|
|
|
DOL, Star
Delta Starter designing for 3 phase motors with
specification. |
|
|
|
|
|
Practical
wiring session on different controls. |
|
|
|
|
|
|
|
Motor
drives- AC drives and DC drives. |
|
|
|
|
|
|
|
|
Programming and installation of VFDs. |
|
|
|
|
|
|
|
|
Discrete
and Continuous speed control using VFDs. |
|
|
|
|
|
|
|
Safety
and management concepts of designing a project. |
|
|
|
|
|
2.
Field Instrumentation and Pneumatics |
|
|
|
|
|
|
|
Basic
Instrumentation - Four Parameters-
Pressure,Level,Flow,Temperature |
|
|
|
|
|
Different
types of sensors- analog and discrete |
|
|
|
|
|
|
|
Technical
terms used in instrumentation |
|
|
|
|
|
|
|
|
Calibration and testing of sensors- thermo couples, RTD,
pressure gauge, |
|
|
|
|
|
level
sensors, proximity switches, limit switches etc |
|
|
|
|
|
|
|
Final
control elements- Solenoid valve, control valve, motor actuators,
Solenoids, bellows, manual valves etc |
|
3.
Programmable Logic Controllers (PLC) |
|
|
|
|
|
|
|
Architecture of PLC- different modules, power supply unit
etc |
|
|
|
|
|
|
Need of
PLC in designing. |
|
|
|
|
|
|
|
|
|
Different
types of sensors- sinking, sourcing, NPN, PNP. |
|
|
|
|
|
|
Monitoring the process through sensors- connection
details. |
|
|
|
|
|
|
Analog
addressing, continuos process monitoring and control. |
|
|
|
|
|
|
Different
types of controllers- ON/OFF, Proportional, Derivative, Integral and
PID control. |
|
|
|
|
PLC
Programming of branded PLCs. |
|
|
|
|
|
|
|
|
NO/ NC
concept. |
|
|
|
|
|
|
|
|
|
|
Data file
handling- forcing I/O. |
|
|
|
|
|
|
|
|
|
Wiring
and fault correction. |
|
|
|
|
|
|
|
|
|
Programming practices. |
|
|
|
|
|
|
|
|
4. Supervisory Control And Data
Acquisition (SCADA). |
|
|
|
|
|
|
SCADA Packages |
|
|
|
|
|
|
|
|
|
|
Role of SCADA in industrial
automation |
|
|
|
|
|
|
|
|
SCADA system configuration, RTU,
communication protocols. |
|
|
|
|
|
|
Script programming. |
|
|
|
|
|
|
|
|
|
Real time and historical
trend. |
|
|
|
|
|
|
|
|
Configuring Alarms. |
|
|
|
|
|
|
|
|
|
Real time project development with
PLC interfacing. |
|
|
|
|
|
|
|
Communication with other
software. |
|
|
|
|
|
|
|
|
Recipe management. |
|
|
|
|
|
|
|
|
|
Accessing different security
levels. |
|
|
|
|
|
|
|
|
Report generation of current
plant. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5. Distributed Control System (
DCS) |
|
|
|
|
|
|
|
|
Architecture of DCS |
|
|
|
|
|
|
|
|
|
Yokogawa Centum CS 3000 |
|
|
|
|
|
|
|
|
|
Comparison of PLC with DCS |
|
|
|
|
|
|
|
|
Programming languages for
DCS |
|
|
|
|
|
|
|
|
Different types of cards and their
functions |
|
|
|
|
|
|
6. Human Machine
Interface |
|
|
|
|
|
|
|
|
|
Different types of operator
Interfaces – Textual, Graphical |
|
|
|
|
|
|
Wiring practice of HMI |
|
|
|
|
|
|
|
|
|
Data handling with HMI |
|
|
|
|
|
|
|
|
|
Configuration and interfacing to PLC
and PC |
|
|
|
|
|
|
|
Communication standards- DF1,
Ethernet, DH45, RS232, RS485, Profibus |
|
|
|
|
7. Control Panel
Designing |
|
|
|
|
|
|
|
|
|
Different types of panels. |
|
|
|
|
|
|
|
|
|
Basic components to be installed in
a panel. |
|
|
|
|
|
|
|
Wiring details of panel. |
|
|
|
|
|
|
|
|
|
Specification and physical dimension
of components. |
|
|
|
|
|
|
Earthing and Cabling of Panels-
standard procedures. |
|
|
|
|
|
|
P&I diagram
preparation. |
|
|
|
|
|
|
|
|
8. Project Design |
|
|
|
|
|
|
|
|
|
|
Design Techniques |
|
|
|
|
|
|
|
|
|
Saftey
Standards |
|
|
|
|
|
|
|
|
|
|
Project Discussions |
|
|
|
|
|
|
|
|
|
Simple Project |
|
|
|
|
|
|
|
|
|
|
Expanding Project |
|
|
|
|
|
|
|
|
|
|
Complete Project |
|
|
|
|
|
|
|
|
|
|
Impliment Wiring PLC and SCADA |
|
|
|
|
|
|
|
|
Usage of PLC and SCADA in Control
Design. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FIELD INSTRUMENTATION
ENGINEERING |
|
|
DURATION : FOUR MONTHS |
|
|
|
|
|
|
|
|
ELIGIBILITY : ITI/DIPLOMA/BE/BTECH |
|
|
|
|
|
|
|
MAJOR
SESSIONS IN WHICH TRAINING IMPARTED ARE |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Oil And Gas Baisic Awareness |
|
|
|
|
|
|
|
|
Baisic Instrumentation |
|
|
|
|
|
|
|
|
Project Management |
|
|
|
|
|
|
|
|
|
Construction Engineering |
|
|
|
|
|
|
|
|
Quality Management |
|
|
|
|
|
|
|
|
|
Callibtation |
|
|
|
|
|
|
|
|
|
Introduction to Control Engineering |
|
|
|
|
|
|
|
Baisic Knowledge to PLC,SCADA &
DCS |
|
|
|
|
|
|
|
IMPLANT TRAINING IN PETROCHEMICHAL
PLANT |
|
|
|
|
|
|
1. Oil And Gas Baisic
Awareness |
|
|
|
|
|
|
|
|
|
Saftey Awareness |
|
|
|
|
|
|
|
|
|
Hazardous Area And Intrinsic Saftey |
|
|
|
|
|
|
|
|
PTW (Permit To Work) |
|
|
|
|
|
|
|
|
|
Task / Risk Awareness |
|
|
|
|
|
|
|
|
|
Working at Heights,Slips,Trips
Awareness |
|
|
|
|
|
|
|
H2S (Hydrogen Sulphide) And Nitrogen
Awareness |
|
|
|
|
|
|
Noise And Pressure Testing
Awareness |
|
|
|
|
|
|
|
Mechanical Isolations And Electrical Saftey
Awareness |
|
|
|
|
|
|
Corrosion Awareness |
|
|
|
|
|
|
|
|
|
ATEX,IEC AND IEEE Standards/European Pressure
Equipment Directives |
|
|
|
|
2 Baisic Instrumentaion |
|
|
|
|
|
|
|
|
|
Introduction To Instrumentation |
|
|
|
|
|
|
|
|
Pressure Meaurement |
|
|
|
|
|
|
|
|
|
Level measurement |
|
|
|
|
|
|
|
|
|
Flow Measurement |
|
|
|
|
|
|
|
|
|
Temperaure Measurement |
|
|
|
|
|
|
|
|
|
Process Control Fundamentals- Open Loop(Manual
Control) ,Closed Loop (Automatic Loop).. |
|
|
|
Introduction To Control Modes - ON/OFF,PID
.. |
|
|
|
|
|
|
|
Introduction To HVAC And Fire And Gas
System |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3. Construction Engineering |
|
|
|
|
|
|
|
|
|
Project Management |
|
|
|
|
|
|
|
|
|
Instrumentation Erection Procedures |
|
|
|
|
|
|
|
|
Quality Assurance And Quality
Control |
|
|
|
|
|
|
|
Awareness of Junction Box,Stangents,Cable Tray
Fabrication And Erection |
|
|
|
|
Cable Glanding ,Termination and
Ferruling. |
|
|
|
|
|
|
|
Tubings and Air Line Works |
|
|
|
|
|
|
|
|
|
Familirization of Fittings,Valves,Manifolds
..etc |
|
|
|
|
|
|
|
Familiarization of all Drawings Related to
Filed Instrumention-P&ID,Location Sketch, |
|
|
|
HookUp,JB Wiring Diagrams,ILDS..etc |
|
|
|
|
|
|
|
4. Calibration |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Operation of Test Equipments |
|
|
|
|
|
|
|
|
Calibration of FIELDBUS SYSTEM
RELATED INSTRUMENTS |
|
|
|
|
|
|
Calibration of Major Industrial Instruments
like Transmitters,Positioners,Switches etc |
|
|
|
Calibration of
Pressure,Temperature,Flow,Level,Conductivity,PH Sensors. |
|
|
|
|
Familiarization of Thermowell,Burdon
Tube,Electronic Timer,Relays,Push Buttons,Contactors, |
|
|
|
Rotameter,Air Regulator,Circuiy
Breakers,Manifold Valves ,Fittings Used in Instrumentation
Field |
|
|
PreCommissioning Activities - Meggering
,ContinuityChecking,LOOP Checking |
|
|
|
|
Familiarization of Instrumentation Calibration
Documents - Data Sheet Evaluation, |
|
|
|
|
Preparation of Calibration Reports
etc |
|
|
|
|
|
|
5. Baisic Knowledge to Control Engineering
PLC,SCADA & DCS |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Electrical drives and
controls |
|
|
|
|
|
|
|
|
Various types of PLC's and its selection
criteria |
|
|
|
|
|
|
|
Architecture and working principle |
|
|
|
|
|
|
|
|
Creating and Editing Ladder program |
|
|
|
|
|
|
|
|
Simulation , Uploading and downloading
program |
|
|
|
|
|
|
Scada application development |
|
|
|
|
|
|
|
|
Alarm configuration |
|
|
|
|
|
|
|
|
|
Historical and realtime Trend |
|
|
|
|
|
|
|
|
Interfacing of Plc with Scada |
|
|
|
|
|
|
|
|
case study of yokogava centums3000 |
|
|
|
|
|
|